Wastewater Collection System
Wastewater Treatment Plant
The function of the Wastewater Distribution is to treat and maintain this system for the purpose of welfare of the community. Our Wastewater plant is an activated sludge process. Our plant is maintained 24 hours 7 days a week. We have two employees that operate the plant to ensure that it operates with no problems.
http://www.cityofcarrizo.org/users/pw/cs_works_waste_water_plant.jpg
This division's primary responsibility is the treatment and disposal of all domestic, commercial, and industrial wastewaters, as well as maintaining the lift stations located throughout the City. There are two wastewater treatment plants located within the City to accommodate the flow from the entire City, which are located off of Hwy 85 E., and Cactus Drive.

Latest News: Arid Exempt (AE) Municipal Solid Waste Facility
Few job duties performed under the Wastewater
  • Take daily samples to ensure accuracy in the levels of sludge
  • Take samples of the sludge to the Pollution Control Center Laboratory; located in Universal City, TX.; to analyze to verify compliance with State and Federal requirements
  • Maintain all the dry beds of sludge and dispose of it accordingly
  • Provide treatment of wastewater collected to meet permit requirements
powered by ezTaskTM